Nestle Dennington
This was the demolition of an old coffee factory at Dennington near Warrnambool ensuring that 98% of the material demolished was retained for recycling. This 6 month project consisted of demolishing 2 six storey, 8000 sq mt buildings/factories and other smaller buildings. All concrete and brick rubble was later crushed on site to produce 8000 tonne of product that was sold to the community with outstanding results.



