Pentridge Housing Development

This 12 month $500,000 project consisted of a variety of tasks to prepare the existing Pentridge Jail for residential housing. 

  1. Asbestos and contaminated silastic removal
  2. Demolition of brick and concrete structures
  3. Relocation of Heritage Wall
  4. Crushing of 13,560 tonne of NDCR and concrete – size of rock to development specification
  5. Delicate separation of heritage and non heritage dwellings
  6. Removal of razor wire from outer perimeter fence.